S9074-AQ-GIB-010/248 Rev 1
Table A-5. Performance Qualification Test Limits 1/
Required Requalification Test Assembly
Element
Qualification Limit
Changes Requiring Requalification
Change from plate to extrusion. Change from extrusion to multi-void hollow extrusion Change to different machine from that employed for qualification testing Change from FSW to FSP or vice versa Change from one method to another as listed in A-3.7.4.1.1 Change from one method to another as listed in A-3.7.4.2 Change in thermal management method from that recorded in the procedure qualification test report Change from manual to automatic or vice versa
Base material form employed for qualification testing
Test no. 3 (figure A-6)
Base material form
Machine employed for qualification testing
Test no. 3 (figure A-6)
Machine
FS variant employed for qualification testing FS tool class employed for qualification testing Control method employed for qualification testing
Test no. 3 (figure A-6) Test no. 3 (figure A-6) Test no. 3 (figure A-6) Test no. 3 (figure A-6) Test no. 3 (figure A-6) Test no. 3 (figure A-6) Test no. 3 (figure A-6)
FS variant
FS tool class
Control method
Thermal management Thermal management employed for qualification testing
Seam tracking
Manual or automatic
Shielding gas employed for qualification testing Filler material employed for qualification testing
Shielding gas
Change to the use of shielding gas
Filler material
Change to the use of filler material
NOTE:
1/ Performance qualification assemblies shall be evaluated in accordance with A-3.5 and table A-2.
p
t
u
NOTES: t = base material minimum nominal thickness p = plunge depth u = unprocessed depth
Figure A-1. Schematic Illustrating the Effective Processing Size Defined by Ratio of (p/t)
A-20
Made with FlippingBook - Share PDF online