Parkhead Viaduct restoration nears completion - preserving a key heritage structure while enabling modern transport.
REGENERATION ACCELERATES 2023–2024
Wednesbury Depot expansion begins.
Final track welded into place in Digbeth.
Expanded tram network is pivotal to the success of the 2022 Commonwealth Games in Birmingham, providing a sustainable transport for the 1.5 million (fact provided by CoPilot) attendees.
Hanson’s Ale Bridge receives heritage recognition.
NETWORK REALISED 2021–2022
Carbon savings exceed 3,389 tCO₂e in 2023 alone, contributing to a total of 7,579 tCO₂e saved (2022–2025).
Bridge structures installed along the Wednesbury to Brierley Hill route.
Carbon reduction initiatives strengthened - exceeding annual carbon targets. The implementation of innovations including the use of hydrotreated vegetable oil as a diesel alternative, fibre- reinforced concrete slab track and solar powered welfare cabins amongst others.’
Metro investment aligns with the West Midlands’ wider £6.1bn green transport programme.
Moor Street Queensway Drone Footage
Lower Bull Street Timelapse
Corporation Street Timelapse
Made with FlippingBook - Online magazine maker