Tracks 2022

Solar Farm Construction Virginia

• 300 AC solar site • 100 AC of tree clearing, removal, and burning • 900,000 CY of earthwork • Construction of permanent and temporary sediment basins • Demolition of existing structures

C-51 Reservoir Florida

• Public Private Partnership • 500,000 CY Embankment Fill

• 20,000 LF Soil-Bentonite Slurry Wall • 200 LF Soil Cement Bentonite Wall • 170,000 CY Roller Compacted Concrete • 2,200 LF 96” TBM Tunneling • 40’ Tall Gated Water Control Structure • 1,800,000 CY Cell Excavation • 15,000 CY Riprap & Bedding Material