Castle Mountain Pad 1A & 1B Construction & Contract Mining California
• 235 AC of Clearing & Stripping • 388,000 CY of Topsoil Removed • 917,942 CY of General Excavation & Embankment • 434,003 CY of Leak Detection Gravel Placed
• 594 LF 20” HDPE SDR Pipe Installed • 26,938,980 SF Liner • 17,837,185 CY of Ore & Waste
• 520,637 CY of Overliner Gravel Placed • 13,360 LF of 2” HDPE Pipe Installed • 245,110 LF 4” HDPE Pipe Installed • 45,100 LF 18” HDPE Pipe Installed