2915P Speedtiller Powerflex 15M Operator Safety Manual

Maintenance

DAILY MAINTENANCE CHECK FOR OPTIMUM PERFORMANCE

BEFORE STARTING WORK NOTE: For all tyre pressure and tension specifica- tions refer to 1. SPECIFICATIONS - Tyre Specification Table. • Follow tension specifications. • Before mounting wheel to machine, check all hub and rim contact surfaces are undamaged and free of paint, dirt and grease. • Check tension wheel nuts for torque specifi- cations. • Check all pivot pins are fastened and anchor bolts are correctly tensioned. • Lubricate wheel stubs with standard viscosity oil. • For field operation: re-tension after 1st, 5th, then every 50 hours of operation. • For road travel re-tension first 3 miles (5kms), 10 miles (15kms), and thereafter at 25 miles (40kms) intervals. • Check tyres are inflated according to pressure stated on tyre. • Check discs and disc bolt tension to specified torque 250ft/lb / 340nm. • Check for damaged, worn and fatigued parts. Have machine repaired if necessary. • Ensure all appropriate safety decals are securely attached to machine. • Check hydraulic system is fully primed 3. HYDRAULIC OPERATION & SAFETY - Prim- ing Hydraulic System. • Check all safety mechanisms are in place and operating correctly. • Lubricate rear roller bearings 5. MAINTE- NANCE - Lubrication of Heavy Roller Bearings. • Ensure Instruction manual has been read, understood and stored with machine. NOTE: Always reset adjustments for front disc gang lateral positioning according to instruc- tions 4. FIELD OPERATION - Lateral Front Disc Gang Positioning.

Disc bolts - Check first 10hrs of operation

Figure : 5.1 Disc Bolts.

Disc arm locating bolts - Check first 10hrs of operation

Figure : 5.2 Disc Arm Bolts.

5.35.3

2915P Speedtiller Powerflex

OPERATOR & SAFETY MANUAL

2915P Op & safety manual.indb 3

6/02/2023 9:31:19 AM

Made with FlippingBook - Online Brochure Maker