T I TA N T I M E S | 2 0 1 8 Y E A R I N R E V I E W Channel Slopes with PYRAMAT® woven three- dimensional High-Performance Turf Reinforcement Mats and Engineered Earth Anchors .
4
“designed specifically for severe erosion challenges and proven to provide up to 75 years of design life.”
04 - Largest ARMORMAX® Installation in Canada
We are proud to have worked with the RM of Stanley in South-Eastern Manitoba on the Reinland Drain Erosion Remediation project which involved the largest installation of ARMORMAX® Engineered Earth Armoring System in Canada, and the first in Manitoba. The Reinland Drain is a large municipal drainage channel that holds and drains intermittent water flow from regional spring melt/breakup and peak discharge events. Failing rock rip rap from heavy run-off flows had been causing reoccurring erosion of the channel slopes—an on-going problem spanning 75 years! The RM was looking for a superior longer- term erosion control solution and engaged Stantec’s engineering services.
View of channel with gabions at the floor base.
Made with FlippingBook flipbook maker