Planning - Level Cost Estimates
The estimates in Figure 15 are for ten of the Greenway Corridors identified in the plan. These corridors repre- sent a range of project types and magnitudes.
These estimates are for planning purposes and, therefore, are informational. Estimates will be refined to re- flect other surface materials and desired amenities as specific projects progress through the project develop- ment and environment and design phases.
Figure 15. Selected Vision Greenways cost estimates
Cost Range Esti- mate (2023 dol- lars)
Surface Type
Length (approx. miles)
Selected Vision Greenway
Memorial Bikeway: Upper Tampa Bay Trail to Memorial Road
Paved
2.3
$3.22M— $5.06 M
Memorial Bikeway: Upper Tampa Bay Park to George Road
Paved
6.9
$9.66M— 15.18 M
Northwest Plant City Greenway
Paved
13.4
$18.76M— $29.48 M
South Hillsborough Pipeline Trail: Lumsden Rd to Lithia Pinecrest Rd, and Fishhawk Sports Complex to Hometown Ln along Fishhawk
Paved
6.4
$8.90M— 13.99 M
Shell Point Road: Cedar Drive - 15th Street SE
Paved
3.3
$4.62M— $7.26 M
South Coast Greenway, Phase V: Progress Vil- lage (66th Street S to US Highway 41 S )
Paved
4.4
$6.16M— 9.68 M
South Coast Greenway, Phase VII: Palm River (Selmon Expressway – Madison Avenue)
Paved
3.6
$5.04M— $7.92 M
Grand Alafia Hiking Loop
Unpaved
30.3
$8.7M— 11.8 M
Hillsborough Preserve Connector
Unpaved
31.3
$9M— $12.2 M
Typical Blueway
Blueway
NA
$1,000 — $1 M
1. The segment of the South Hillsborough Pipeline Trail along Lithia Pinecrest Road is not included. It is being studied separatelyand will be included in the Lithia Pinecrest Shared Use Path, part of an ongoing Project Development and Environment (PD&E) Study.
HILLSBOROUGH COUNTY GREENWAYS AND TRAILS MASTER PLAN
48
Made with FlippingBook Learn more on our blog