SWPP INSTALLATION & MAINTENANCE Job

CITY OF PALO ALTO

Construct a temporary bypass pipeline in the WSTD vault to connect to the Palo Alto water main. The bypass piping will include a meter set consisting of a strainer, flow meter, swing check valve, and pressure reducing valve in the WSTD vault. Also replace the current 16” steel pipe connection between the vaults with ductile iron pipe according to the terms and plans detailed in CPAU’s plans. Replace a 16” water pipeline and install a 4” bypass at Service Connection #77, within a portion of SFPUC’s Pipeline Right of Way, located at California Avenue, in the City of Palo Alto, CA.

www.gswconstruction.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online