FY25 Annual Report

TOM ADAMS BRIDGE EMERGENCY REPAIRS

A storm surge caused by Hurricane Milton caused undermining of the concrete slope paving (riprap) and the sidewalks at all four quadrants of the Tom Adams Bridge. The County needed to hire a contractor for an emergency repair. With the Sarasota portion of Beach Road being destroyed and not open to traffic, the Tom Adams Bridge was the only way onto and off of Englewood Beach. It was crucial to repair the bridge to protect the roadway.

HURRICANE DAMAGE

COMPLETED REPAIRS

Kelly Slaughter, Projects Manager

17

Made with FlippingBook Annual report maker