FY25 Annual Report

REGINA DR X NATALIE ST ROAD CROSSING PIPE REPLACEMENT

A small road crossing pipe was installed at the intersection of Regina Drive & Natalie Street in Englewood East. The project was necessary due the deterioration of a corrugated metal pipe (CMP), which was no longer functioning properly. The scope of work included the removal of the failed pipe, trenching across the roadway, installation of a new pipe to restore proper drainage, and full restoration of the road surface. The project was completed efficiently with minimal disruption to local traffic and will improve stormwater flow and roadway stability in the area.

64

Made with FlippingBook Annual report maker