FY25 Annual Report

ACCOMPLISHMENTS WORK

ADA MATS INSTALLED 30

ASPHALT MAINTENANCE 182 TONS

BRUSH CUTTING 106,135 CUBIC YARDS STANDARD CUTS 21,739 SQUARE FEET

CONCRETE SIDEWALK REPAIR/REPLACE 6,785 SQUARE FEET

CATCH BASIN INSTALL/REPLACE 22

CATCH BASIN REPAIRS 150

DRAINAGE MAINTENANCE 882,114 SQUARE FEET

GUARDRAIL INSTALL/REPAIR

LARGE PIPE INSTALLS 511 LINEAR FEET

INVESTIGATIONS 1,008 VACUUM CLEANING 4,152 CULVERTS

LARGE PIPE REPAIRS 16

156 LINEAR FEET

SMALL PIPE REPAIRS 101

SMALL PIPE INSTALLS 6,374 LINEAR FEET PAVEMENT RESTORATION 75 TONS OF ASPHALT

MENZI MUCK OUTFALL MAINTENANCE 1,286,560 SQUARE FEET FLAIL MOWING 9,929,148 CUBIC YARDS

MAJOR OUTFALL MAINTENANCE 18,006 SQUARE FEET ROW CLEARING/ HAULING 14,340 TONS OF DEBRIS

NON-ASPHALT ROAD GRADING 0.1 MILES SHOULDER REPAIR 20 MILES

OPEN ROAD CUT REPAIRS 346 TONS OF ASPHALT

SIDE LOT OUTFALL MAINTENANCE 106,700 SQUARE FEET