ACCOMPLISHMENTS WORK
ADA MATS INSTALLED 30
ASPHALT MAINTENANCE 182 TONS
BRUSH CUTTING 106,135 CUBIC YARDS STANDARD CUTS 21,739 SQUARE FEET
CONCRETE SIDEWALK REPAIR/REPLACE 6,785 SQUARE FEET
CATCH BASIN INSTALL/REPLACE 22
CATCH BASIN REPAIRS 150
DRAINAGE MAINTENANCE 882,114 SQUARE FEET
GUARDRAIL INSTALL/REPAIR
LARGE PIPE INSTALLS 511 LINEAR FEET
INVESTIGATIONS 1,008 VACUUM CLEANING 4,152 CULVERTS
LARGE PIPE REPAIRS 16
156 LINEAR FEET
SMALL PIPE REPAIRS 101
SMALL PIPE INSTALLS 6,374 LINEAR FEET PAVEMENT RESTORATION 75 TONS OF ASPHALT
MENZI MUCK OUTFALL MAINTENANCE 1,286,560 SQUARE FEET FLAIL MOWING 9,929,148 CUBIC YARDS
MAJOR OUTFALL MAINTENANCE 18,006 SQUARE FEET ROW CLEARING/ HAULING 14,340 TONS OF DEBRIS
NON-ASPHALT ROAD GRADING 0.1 MILES SHOULDER REPAIR 20 MILES
OPEN ROAD CUT REPAIRS 346 TONS OF ASPHALT
SIDE LOT OUTFALL MAINTENANCE 106,700 SQUARE FEET
67