Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions 10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Exterior & Garage Inclusions
Concrete finish to porch and alfresco
Slab
Class ‘M’ Australian standard engineered slab
Solar
6.6kW smart solar system with 5kW inverter
Facade
Classic facade. Single Storey will be in brick, while the double storey is brick and cladding
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
Mandatory Site Works
Taps
Garden taps provided to front and rear
Corinthian urban PURB 4 panel carve entry door in painted finish Gainsborough Trade Pro Adel and Bela entrance lever lock sets with double cylinder deadbolt to entry
Entry Door
22.5 degree roof pitch. may vary on facade detail and for first roof of double storey designs
Roof sarking - a protective membrane positioned between the rafters and roof tile battens, to maximimise energy efficiency while adding extra protection of high wind and wet weather events
Roof
Concrete roof tiles in a wide range of profiles and colours from the standard nominated range Choice of Colorbond steel roof
Powder coated aluminium windows (choice of colours) from the standard nominated range and sliding aluminium doors
Windows & Sliding Doors
*1 Clarendon Homes advises that the NSW State Government has implemented changes to BASIX requirements for all Contracts signed from 1st October 2023. This may affect the BASIX requirements and the way your home is assessed to meet those requirements. Any additional changes required to suit the new Government regulations will be at an additional cost by way of variation. *2 Prices are subject to, Bore Hole, Contour, Bushfire, RTA, Hydraulic Engineers or other Statutory reports as required by your 10.7 certificate, 88B or Site Manager. Up to 8m allowed to the relevant connection point with the exception of acreage designs which have 25m allowed.
Keyed locks to external aluminium sliding doors and all opening windows
Framing
Clarendon Homes’ Hybrid Framing System with both timber and steel and a Lifetime Structural Guarantee. Excludes some areas
Sectional overhead garage door for smooth action in a choice of colours from standard nominated range
Automatic garage door opener - enjoy the convenience of one unit with cradle-mounted control in garage and two remote controls, as well as a powerpoint which is required for connection
Light point to garage as indicated on plan
Garage
Internal flush panel Corinthian access door to garage with Gainsborough Trade Pro Adel and Bela entrance lever lock set
Essentials Application Fee
Stepdown included between house and garage Brick veneer plasterboard lined garage
Development Application and Construction Certificate Fees
Water Tank
3000L water tank
Flooring
Carpet and underlay, hybrid flooring, glazed ceramic tiles from standard nominated range to designated areas
Air Conditioning
Relax in climatised comfort and always feel at home with fully ducted reverse cycle air conditioning
R6.0 to ceiling under roof to all living areas, excluding garage and alfresco R2.5 glass wool batts to external walls for living areas with R2.2 to internal walls between garage and living areas
Other Home Inclusions Tender Period
Insulation
12 months tender period from date of deposit
Security Fencing
Site security fencing as per WH&S requirements
Construction Insurance Maintenance Period
Earthworks
Provide balanced cut and full up to 1.0m to achieve a level building platform
Construction insurance premium (home owners warranty)
Piering
Piering allowance
90 day maintenance period
Concrete
Concrete pump
Water
Water service connection
Pest Control
Pest control certification
Water Fees
Water authority fees (regular connections only)
Lighting
Light points including compact fluorescent globe
Sewer
Sewer connection to junction at front/rear with boundary
Gas
Gas connection (subject to availability)
Stormwater
Provide 100mm stormwater connection to street/easement
Smoke Detectors Hot Water System Electrical Safety
Smoke detectors provided (direct wired with battery backup)
Power
Underground power - 3 phase provision included (where available)
Continuous flow gas hot water system
Earth leakage electrical safety switch in single phase meter box
Electrical
2 x TV and 2 x Cat 6 Data points
BASIX Assessment
BASIX assessment to State Government requirements
36 | ASPIRE HOME INCLUSIONS
ASPIRE HOME INCLUSIONS | 37
Made with FlippingBook Publishing Software