EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

PROJECT OVERVIEW East Berry Street is an east-west thoroughfare located in southeast Fort Worth. A six-mile segment of East Berry Street from IH-35W to Lake Arlington is the focus of this study. The study objective is to identify an integrated transportation, land use, economic development, and technology strategy that results in improved walkability, enhanced safety, additional travel choices, and a development pattern that supports the corridor vision and local community needs. The study will help advance design and construction activities funded in the 2022 Bond program; and prepare project for implementation in future bond cycles. The study process includes:

IMPLEMENTATION STRATEGY Outlining the steps required to realize the agreed upon vision including a recommended form-based zoning code, supporting policies and key investments. Communicating the recommended land development strategy, transportation infrastructure needs, traffic operation improvements, transit service additions, and multimodal connections. PREFERRED LAND USE CONCEPTS & TRANSPORTATION ENHANCEMENTS

VISIONING Listening to stakeholders, residents, and businesses through a robust engagement process combined with technical considerations and performance expectations.

IDENTIFICATION AND TESTING ALTERNATIVES Identifying land development concepts and transportation enhancements that support corridor objectives and evaluating appropriateness.

Introduction | 11

Made with FlippingBook interactive PDF creator