Figure 60. Lake Arlington
Eugene McCray Park at Lake Arlington
MU-1(Low Intensity Mixed-use), MU-2(High Intensity Mixed-use)
Existing Zoning:
Lake Arlington is an major regional amenity that is underutilized along its western edge due to lack of visibility, access, and existing industrial uses. The right calibration of the existing MU zoning can facilitate redevelopment along with a clearer vision for the area.
Notes / Considerations
Potential
EXCELLENT
LAND USE
116 | East Berry Corridor Study
Made with FlippingBook interactive PDF creator