EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

BERRY ST

924 E BERRY ST

1001 E BERRY ST

1037 E BERRY ST

1101 E BERRY ST

1111 E BERRY ST

1201 E BERRY ST

1209 E BERRY ST

STAMPED INTEGRAL COLORED CONCRETE (FLAGSTONE PATTERN)

EAST BERRY ST.

1108 E BERRY ST

1020 E BERRY ST

1028 E BERRY ST

1120 E BERRY ST

1200 E BERRY ST

1024 E BERRY ST

1000 E BERRY ST

1008 E BERRY ST

1608 E BERRY ST

944 E BERRY ST

Red Yucca z Evaluate positive offsets for left-turn lanes. z Ensure lanes are aligned across IH-35W bridge z Extend roundabout splitter island to eliminate cross access of Glen Garden Drive Mexican Feather Grass z BAT lanes – verify left turn movements with curb radius z Align cross streets if possible (i.e. Mississippi Avenue) Gulf Coast Muhly Design Considerations To be evaluated and/or applied at preliminary engineering phase of implementation. Roadway: z Include left-turn lanes at signalized intersections (i.e. Pate Drive) z Evaluate priority of each driveway closures Salvia

Pedestrian Facilities: z Directional ramps to be provided at all intersections

Color Guard Yucca z Use blended transition ramps if necessary z Crosswalks to be placed at end of curb radius z Pedestrian Hybrid Beacon to be provided at any mid-block pedestrian crossing z Provide full-width side path across railroad z 6’ minimum adjacent sidewalk may be considered at Mitchell Boulevard intersection to minimize ROW impact Transit: z Preferred station locations to be identified by Trinity Metro during 30% design. z Stations to be placed on far side of any major intersection z Access management measures to be considered for transit facilities Lemon Lime Nandina Agave Kaleidoscope Abelia NORTH

Texas Redbud

z Evaluate the need for widening existing bridge east of Riverside Drive z Native landscaping to be considered during design and implementation

Fort Worth, Texas May 2024

Concepts | 127

Made with FlippingBook interactive PDF creator