EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

Old Mansfield Road to Cobb Park Drive Concept

FLOODPLAIN

COBB PARK TRAIL CONNECTION

Gulf Coast Muhly

PEDESTRIAN STREET LIGHT

1600 COBB PARK DR

Fountain Grass

Bald Cypress

STAMPED INTEGRAL COLORED CONCRETE (FLAGSTONE BRICK PATTERN)

RIGHT-OF-WAY TO BE ACQUIRED THROUGH INTERSECTION

3903 E BERRY ST

2306 E BERRY ST

Mexican Feather Grass

CANOPY TREE

2350 E BERRY ST

EAST BERRY ST.

Kaleidoscope Abelia

Live Oak

2306 E BERRY ST

2320 E BERRY ST

Salvia

1600 E BERRY ST

Lacebark Elm

Lemon Lime Nandina

Location Map

EXISTING DRIVEWAY TO BE CLOSED

Stamped Integral Colored Concrete (Flagstone Pattern)

EXISTING ROW

Red Yucca

Color Guard Yucca

PROPOSED TRANSIT STOP

NORTH

STREET ILLUMINATION

Fort Worth, Texas May 2024

EAST BERRY STREET CONCEPT - OLD MANSFIELD RD. TO COBB PARK DR.

128 | East Berry Corridor Study

Made with FlippingBook interactive PDF creator