SIGNAL TO BE MODIFIED TO ACCOMADATE LARGER MEDIANS AND PEDESTRIAN IMPROVEMENTS
4325 E BERRY ST
3116 CROUCH AVE
4501 E BERRY ST
4401 E BERRY ST 4405 E BERRY ST 4409 E BERRY ST 4413 E BERRY ST
4601 E BERRY ST
STANDARD CONCRETE SIDEWALK
STAMPED INTEGRAL COLORED CONCRETE (FLAGSTONE PATTERN)
STAMPED INTEGRAL COLORED CONCRETE (HERRINGBONE PATTERN)
PEDESTRIAN STREET LIGHT
AST BERRY ST.
4612 E BERRY ST
4600 E BERRY ST
4400 E BERRY ST
4500 E BERRY ST
3301 S HUGHES AVE
4328 E BERRY ST
4320 E BERRY ST
4324 E BERRY ST
Gulf Coast Muhly Design Considerations To be evaluated and/or applied at preliminary engineering phase of implementation. Roadway: z Include left-turn lanes at signalized intersections (i.e. Pate Drive) z Evaluate priority of each driveway closures Salvia
Pedestrian Facilities: z Directional ramps to be provided at all intersections
Color Guard Yucca z Use blended transition ramps if necessary z Crosswalks to be placed at end of curb radius z Pedestrian Hybrid Beacon to be provided at any mid-block pedestrian crossing z Provide full-width side path across railroad z 6’ minimum adjacent sidewalk may be considered at Mitchell Boulevard intersection to minimize ROW impact Transit: z Preferred station locations to be identified by Trinity Metro during 30% design. z Stations to be placed on far side of any major intersection z Access management measures to be considered for transit facilities Lemon Lime Nandina Agave Kaleidoscope Abelia
z BAT – verify left turn movements with curb radius z Align cross streets if possible (i.e. Mississippi Avenue)
Red Yucca z Evaluate positive offsets for left-turn lanes. z Ensure lanes are aligned across IH-35W bridge z Extend roundabout splitter island to eliminate cross access of Glen Garden Drive Mexican Feather Grass z Evaluate the need for widening existing bridge east of Riverside Drive z Native landscaping to be considered during design and implementation
Texas Redbud
Fort Worth, Texas May 2024
Concepts | 131
Made with FlippingBook interactive PDF creator