EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

Cobb Park / Riverside Drive T.O.D. Concept

2

1

2

2

4

5

2

3

7

6

1. Existing Cobb Park - extend trail system along Sycamore Creek to north with eventual connection to Trinity Park and downtown Fort Worth 2. Encourage residential and mixed-use development to take advantage of park amenity 3. Transition to low/medium density housing adjacent to existing neighborhoods 4. Expand Sierra Vista Transfer Center into a transit hub 5. Anchor development with neighborhood grocery 6. Extend Cobb Park to the south and connect to Ellis Park via bike/pedestrian trails, with

spurs connecting to new and existing neighborhoods 7. Preserve existing treeline, can be incorporated into street median 8. Extend Yuma Drive south to station. 9. Station plaza 10.Proposed NCTCOG’s Mansfield Line 11.Transit oriented development (residential, institutional and mixed-use) 12.Yuma Drive connection to Riverside Drive 13.Potential destination attraction or institutional campus

8

11

13

9

6

11

10

12

134 | East Berry Corridor Study

Made with FlippingBook interactive PDF creator