EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

COSTING East Berry Street Cost Estimates

Conceptual Level Project Cost Projection

From

To

Total Project Cost

Design Cost

IH-35W

Miller Avenue

$92,400,000 - $103,700,000

$10,400,000 - $11,800,000

Miller Avenue

Loop 820

$25,900,000 - $56,200,000

$3,300,000 - $5,600,000

Loop 820

Lake Arlington

$7,600,000 - $13,000,000

$1,600,000 - $3,300,000

Cost Savings Considerations (Value Engineering) To be evaluated at preliminary engineering phase of implementation.

z Riverside Drive and East Berry Street Intersection – Omit from design, recent intersection improvements z Cobb Park to Mitchell Boulevard – Sidewalk and landscaping improvements only

z Mitchell Boulevard to US-287 – Revise proposed cross section to maintain current roadway footprint to avoid additional right- of-way z US-287 to Miller Avenue – Provide sidewalk/sidepath and parkway improvements; roadway maintenance where needed

z Omit BAT lanes (pavement and signal infrastructure) z Limit driveway consolidation z 8’ side path or bike on parallel path in areas to avoid additional right-of-way

196 | East Berry Corridor Study

Made with FlippingBook interactive PDF creator