COSTING East Berry Street Cost Estimates
Conceptual Level Project Cost Projection
From
To
Total Project Cost
Design Cost
IH-35W
Miller Avenue
$92,400,000 - $103,700,000
$10,400,000 - $11,800,000
Miller Avenue
Loop 820
$25,900,000 - $56,200,000
$3,300,000 - $5,600,000
Loop 820
Lake Arlington
$7,600,000 - $13,000,000
$1,600,000 - $3,300,000
Cost Savings Considerations (Value Engineering) To be evaluated at preliminary engineering phase of implementation.
z Riverside Drive and East Berry Street Intersection – Omit from design, recent intersection improvements z Cobb Park to Mitchell Boulevard – Sidewalk and landscaping improvements only
z Mitchell Boulevard to US-287 – Revise proposed cross section to maintain current roadway footprint to avoid additional right- of-way z US-287 to Miller Avenue – Provide sidewalk/sidepath and parkway improvements; roadway maintenance where needed
z Omit BAT lanes (pavement and signal infrastructure) z Limit driveway consolidation z 8’ side path or bike on parallel path in areas to avoid additional right-of-way
196 | East Berry Corridor Study
Made with FlippingBook interactive PDF creator