EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

2. Ensure pedestrian connectivity is safe, continuous, and accessible for all ages and abilities to access residential and non-residential destinations throughout the corridor

Action #

Description

Related Goals Timeframe Duration

Cost

Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity

$/$$

2.1

Construct pedestrian paths in the Renaissance Square focus area

Short

$

2.2

Fill in all sidewalk gaps on East Berry Street

Short

Fill in Top Priority Sidewalk Gaps at Morningside Middle School Walkshed Fill in Top Priority Sidewalk Gaps at Mitchell Boulevard Elementary School Walkshed Fill in Top Priority Sidewalk Gaps at TA Sims Elementary School Walkshed Fill in Top Priority Sidewalk Gaps at Christene C. Moss Elementary School Walkshed Fill in Top Priority Sidewalk Gaps at AM Pate Elementary School Walkshed Fill in Top Priority Sidewalk Gaps at Sunrise McMillan Elementary School Walkshed

$/$$

2.3

Medium

$/$$

2.4

Medium

$/$$

2.5

Medium

$/$$

2.6

Medium

$/$$

2.7

Medium

$/$$

2.8

Medium

$/$$

2.9 Fill in Top Priority Sidewalk Gaps at Jacquet Middle School Walkshed

Medium

$/$$

2.10

Fill in Top Priority Sidewalk Gaps at Dunbar High School Walkshed

Medium

Extend Cobb Park to the south and connect to Ellis Park via a new trail segment

$$

2.11

Medium

Update the Active Transportation Plan to include the recommended additional pedestrian and trail connections

$

2.12

Safety, Connectivity

Short

200 | East Berry Corridor Study

Made with FlippingBook interactive PDF creator