EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

3. Implement corridor-wide and site-specific improvements to enhance safety

Action #

Description

Related Goals Timeframe Duration

Cost

Enhance crosswalk visibility at the intersection of East Berry Street and Evans Avenue through the instillation of pedestrian refuge islands Enhance the East Berry Street and Riverside Drive intersection with crosswalk visibility enhancements, flashing yellow arrow on signal head, and yellow change intervals Implement improvements on Eastland Street including refreshing stop bars, installation of high-visibility crosswalks, striped on-street parking, and lowering of speed limit to 25 mph Update the traffic signal and enhance crosswalk visibility at the East Berry Street and Village Creek Road intersection. Design and install a roundabout at the East Berry Street and East Berry Street South intersection Design and install a roundabout at the Mitchell Boulevard and East Berry Street South Intersection Design and install a roundabout at the Vaughn Boulevard and Wichita Street Intersection Design and install a traffic circle at the intersection of Evans Avenue and Baker Street Design and install a traffic circle at the intersection of Village Creek Road and Eastland Street Design and install a traffic circle at the intersection of Bishop Street and Crenshaw Avenue Design and install a traffic circle at the intersection of Bishop Street and Strong Avenue Stripe a two-way left turn lane on Miller Avenue from Eastland Street to US-287

$

3.1

Travel Options Immediate

$

3.2

Safety

Immediate

$

3.3

Safety

Immediate

$

3.4

Safety

Immediate

$$$$

3.5

Safety

Medium

$$$$

3.6

Safety

Long

$$$$

3.7

Safety

Long

$$$

3.8

Safety

Medium

$$$

3.9

Safety

Medium

$$$

3.10

Safety

Medium

$$$

3.11

Safety

Medium

$ $

3.12

Safety

Medium

3.13

Implement corridor-wide 35 MPH speed limit

Safety

Immediate

Implementation | 201

Made with FlippingBook interactive PDF creator