5. Utilize access management strategies along East Berry Street to improve safety and align the vision for future land uses

Action #

Description

Related Goals Timeframe Duration

Cost

$

5.1

Evaluate driveway closures along entirety of East Berry Street

Safety

Medium

Design and construct a median along East Berry Street from I-35W to Riverside Dr

*$$$$

5.2

Safety

Medium

*$$

5.3

Consider median along East Berry Street at Canberra Court

Safety

Medium

Design and construct a median along East Berry Street from US-287 to Miller Design and construct a 6-foot median along East Berry Street from Miller Avenue to Edgewood Terrace

*$$$$

5.4

Safety

Medium

*$$$

5.5

Safety

Long

Implementation | 203