6. Expand the trails network to eliminate gaps and facilitate multimodal connections to destinations throughout the corridor

Action #

Description

Related Goals Timeframe Duration

Cost

Extend Trinity Trails south of East Berry Street to Sycamore Creek and the proposed T.O.D. focus area (Cobb Park) Implement trail connections to the neighborhood east of Cobb Park at Bidecker Avenue, Richard Legacy Lane, and Thannisch Avenue

Travel Options, Connectivity Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Safety, Travel Options, Connectivity Travel Options, Connectivity

$$$$

6.1

Medium

$$

6.2

Immediate

*$$$$

6.3 Construct 10-foot sidepath along East Berry Street (See Cross-Sections)

Medium

Construct 10-foot sidepath along west side of Mitchell Boulevard from East Berry Street to Renaissance Drive

$$$

6.4

Medium

Construct 10-foot sidepath along Village Creek Road, south of East Berry Street Construct 10-foot sidepath along the proposed Westshore Way on the east side of the roadway (included in cost estimate) Update the City’s Active Transportation Plan to include new trail connections and additions

$$$

6.5

Medium

*$$$$

6.6

Long

$

6.7

Travel Options Immediate