EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

8. Encourage transit usage by improving the user experience and eliminating barriers to utilization

Action #

Description

Related Goals Timeframe Duration

Cost

Travel Options, Belonging, Connectivity Travel Options, Belonging, Connectivity Safety, Connectivity Safety, Travel Options, Upward Mobility, Connectivity

Enhance priority transit stops to shelters to create a more comfortable transit experience for users

$$

8.1

Short

$$$

8.2

Enhance all transit stops in the study area to shelters

Long

Ongoing

Consider Business Access and Transit Lane s (BAT) at East Berry Street & Riverside Drive, East Berry Street & Mitchell Boulevard, and East Berry Street & Miller Avenue. Fill in sidewalk gaps in priority missing sidewalk areas to improve connections to transit stops and promote public transportation as a safe and viable travel option

$$$$

8.3

Medium

$$

8.4

Short

206 | East Berry Corridor Study

Made with FlippingBook interactive PDF creator