9. Acquire the necessary right-of-way for roadway reconstruction
Action #
Description
Related Goals Timeframe Duration
Cost
Acquire right-of-way from specific properties in accordance with sidewalk expansion
Travel Options, Connectivity Travel Options, Connectivity Travel Options, Connectivity Travel Options, Connectivity Travel Options, Connectivity
$$$$
9.1
Short
$$$
9.2
Obtain 10 feet of right of way from Mitchell Boulevard to US-287
Medium
Obtain 10 feet of pedestrian/landscape easement right-of-way from US- 287 to Miller Avenue Obtain 10 feet of pedestrian/landscape easement right-of-way from Miller Avenue to Edgewood Terrace
$$$
9.3
Medium
$$
9.4
Medium
$$
9.5
Obtain 20 feet right-of-way from Loop 820 to Cravens Road
Medium
Implementation | 207