10. Integrate smart corridor technology and continue to upgrade utilities
Action #
Description
Related Goals Timeframe Duration
Cost
Upward Mobility, Connectivity
$$
10.1
Install fiber optics along East Berry Street.
Medium
Community Building, Connectivity
$$$$
10.2
Install cooling pavement along East Berry Street.
Long
Explore opportunities to expand free public Wi-Fi throughout the corridor. Utilize water main modeling to adequately size and align future density with future needs.
Upward Mobility, Connectivity
$
10.3
Medium
Community Building, Connectivity Community Building, Connectivity Community Building, Connectivity Community Building, Connectivity Community Building, Connectivity Community Building, Connectivity Community Building, Connectivity
$
10.4
Short
Replace degraded or age-appropriate water main lines in conjunction with reconstruction on East Berry Street.
$$$$
10.5
Medium
Replace linear footage of 6-inch water mains to meet minimum standard on East Berry Street.
$$$$
10.6
Medium
Relocate existing water meter locations and replace undersized meters as needed.
$$$$
10.7
Medium
Replace oversized water mains to service property owners as reconstruction occurs along East Berry Street.
$$$$
10.8
Medium
Utilize sanitary sewer modeling to adequately size and align future density with sanitary sewer mains along East Berry Street.
$
10.9
Short
VCP sanitary sewer line replacement from manhole to manhole should be considered during reconstruction of East Berry Street
$
10.10
Medium