EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

This proposed cross section involves shifting the curb-to-curb roadway from the north to allow space for an 8-foot sidepath as well as the acquisition of 10 feet of right-of-way to the south. The figure shown on this page displays rough concept of the shift and the dimensions associated with the proposed reconfiguration.

Figure 17. Segment C Aerial Cross-Section

8’ Sidepath 2 x 11’ Travel Lanes

East Berry St

12’ Two-Way Left Turn Lane

2 x 11’ Travel Lanes

Additional Right-of-Way

Analysis | 55

Made with FlippingBook interactive PDF creator