EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

C3. Expand road network at the Lake Arlington focus area. Lake Arlington is identified as an underutilized asset for people in southeast Fort Worth. This corridor study and analysis strives to bring light to opportunities that the west shore of the lake could be for the community. As development and fresh land uses are presented in this focus area in this study, it is important to think consider the roadways network and connectivity for potential future development. The exhibit to the right displayed the recommended road network for the Lake Arlington focus area. Connectivity to the ONCOR easement north of the focus area should be considered during implementation. C4. Construct roadway connection between Donalee Street and Freddie Street The image below displays a roadway connection opportunity idenified between Donalee Street and Freddie Street to improve connectivity. Figure 25. Donalee - Freddie Connectivity Opportunity

Figure 26. Lake Arlington Connectivity

Legend

Connect to ONCOR easement

Lake Arlington Focus Area New Primary Street Connection New Shared Street Connection Existing Street Removal

Fitzhugh Ave

Elizabeth Rd

820

Dowdell Rd

East Berry St

Berry St

CONNECTIVITY

64 | East Berry Corridor Study

Made with FlippingBook interactive PDF creator