C5. Connect Fitzhugh Avenue/Crenshaw Avenue from US-287 to Loop 820. C6. Connect Eastland Street/Grayson Street from US-287 to Loop 820. C7. Connect Hardeman Street/Garden Lane from US-287 to Carey Street.
East Berry Street is the only thoroughfare located in the study area that runs from IH-35W to Lake Arlington. This analysis recommends that Fitzhugh Avenue/Crenshaw Avenue, Grayson Street/Eastland Street, and Hardeman Street/Garden Lane are to be fully connected and should be considered for addition to the City’s Master Thoroughfare Plan.
C9. Implement trail connections to the neighborhood east of Cobb Park at Bidecker Avenue, Richard Legacy Lane, and Thannisch Avenue. Trail connections are recommended to be considered at the locations seen in the exhibit to the right to provide the neighborhood easy access to Cobb Park. The image is conceptual and grading will need to be considered during design. C11. Update the City’s Master Thoroughfare Plan to include identified connections for Westshore Way, Fitzhugh Avenue/Crenshaw Avenue, Eastland Street/Greyson Street, Hardeman Street/Garden Lane and the primary street connections in Cobb Park T.O.D. and Lake Arlington. Current thoroughfare plan should be amended to include the recommended roadways connections found in this analysis.
Figure 27. Cobb Park Neighborhood Trail Connections
Legend
Proposed Trail Connection Existing Trail
Bidecker Ave
TEXAS US 287
Richard Legacy Ln
Cobb Park
Thannisch Ave
CONNECTIVITY
Analysis | 65
Made with FlippingBook interactive PDF creator