Sidepaths B1. Construct 10-foot sidepath along East Berry Street (See Cross-Sections) B2. Construct 10-foot sidepath along west side of Mitchell Boulevard from East Berry Street to Renaissance Drive B3. Construct 10-foot sidepath along Village Creek Road, south of East Berry Street
B4. Construct 10-foot sidepath along the proposed Westshore Way on the east side of the roadway Trails B5. Extend Trinity Trails south of East Berry Street to Sycamore Creek and the proposed T.O.D. focus area Two-Way Cycle Track B6. Reconfigure Renaissance Drive to include Two-Way Cycle Track on north side of the roadway. Protected Bicycle Lane B7. Retrofit the existing bike lanes to fully protected bike lanes by using enhanced pavement markings Shared-Lane Markings B8. Stripe shared-lane markings from Miller Avenue to Carey Street Bike Stations B9-13. Implement Trinity Metro Bike Stations at the following locations z Sierra Vista Transfer Center z Cobb Park z Renaissance Square z Fiesta Mart z Lake Arlington
BUNCHE PARK
B12
B8
B3
B13
EAST BERRY ST
BUNCHE PARK
BUNCHE PARK
WILLIAM MCDONALD PARK
EDGEWOOD PARK
EDGEWOOD PARK
820
EAST BERRY ST
MARIE F. PATE PARK
WILLIAM MCDONALD PARK
EAST BERRY ST
MARIE F. PATE PARK
B4
WILLIAM MCDONALD PARK
B4
± 0 ± 0
0.5
1
Miles
0.5
1
Miles
Analysis | 81
Made with FlippingBook interactive PDF creator