Sidepaths B1. Construct 10-foot sidepath along East Berry Street (See Cross-Sections) B2. Construct 10-foot sidepath along west side of Mitchell Boulevard from East Berry Street to Renaissance Drive B3. Construct 10-foot sidepath along Village Creek Road, south of East Berry Street

B4. Construct 10-foot sidepath along the proposed Westshore Way on the east side of the roadway Trails B5. Extend Trinity Trails south of East Berry Street to Sycamore Creek and the proposed T.O.D. focus area Two-Way Cycle Track B6. Reconfigure Renaissance Drive to include Two-Way Cycle Track on north side of the roadway. Protected Bicycle Lane B7. Retrofit the existing bike lanes to fully protected bike lanes by using enhanced pavement markings Shared-Lane Markings B8. Stripe shared-lane markings from Miller Avenue to Carey Street Bike Stations B9-13. Implement Trinity Metro Bike Stations at the following locations z Sierra Vista Transfer Center z Cobb Park z Renaissance Square z Fiesta Mart z Lake Arlington

BUNCHE PARK

B12

B8

B3

B13

EAST BERRY ST

BUNCHE PARK

BUNCHE PARK

WILLIAM MCDONALD PARK

EDGEWOOD PARK

EDGEWOOD PARK

820

EAST BERRY ST

MARIE F. PATE PARK

WILLIAM MCDONALD PARK

EAST BERRY ST

MARIE F. PATE PARK

B4

WILLIAM MCDONALD PARK

B4

± 0 ± 0

0.5

1

Miles

0.5

1

Miles

Analysis | 81

Made with FlippingBook interactive PDF creator