EastBerryStreet_REPORT_FINAL_06.11.2025_Print (1)

TRANSIT ASSESSMENT The Transit Assessment for this analysis focuses on enhancing the public transportation experience in the East Berry Street study area and prioritizing sidewalk gaps that link pedestrians to transit stops. The purpose of this analysis is to develop recommendations to be implemented in the study area that encourage residents to use the public transportation system. Creating a network where different modes of transportation can effectively work together to improve first mile/last mile mobility. Currently, residents in the East Berry Street study area have expressed that enhanced transit stops and better walking and biking connections to the transit stops would make riding public transportation more inviting. This analysis provides recommendations that mitigate these issues.

Figure 46. T ransit Top Priority Sidewalk Gap Walksheds and Stops Map

T1

T2

T9

COBB PARK

MORNINGSIDE MIDDLE SCHOOL PARK

35W

287 TEXAS US 287

EAST BERRY ST

ELLIS PARK

ECHO LAKE PARK CIQUIO VASQUEZ PARK

T10

T3

T4

T11

84 | East Berry Corridor Study

Made with FlippingBook interactive PDF creator