2021-2022 Annual Report & Statement

c. Permits are required for all other improvements subject to an established Permit Application Fee. 9. General Requirements a. Before a permit is issued, detailed specifications and plans for all changes, including any relocation of utilities must be submitted along with the Permit for Lot Modification Application (Attached as Exhibit A to these Rules).

b. An approved permit must always be posted in a visible location (on the front Washingtonian Palm) and be kept on the lot during construction.

c. Any addition/deletion to an approved permit application is subject to review and approval by the A&A Committee. d. The Owner is responsible for replacement or modification of any common Area landscaping, utilities, or irrigation components affected in the course of installing approved lot modifications. All irrigation modifications must be completed by the Association’s contracted vendor for Landscape Maintenance, at owner’s expense. e. All improvements must be within the boundaries of the lot (refer to Section 11 of these rules for procedures to determine lot line boundaries.) f. Before a permit will be issued for any change to a lot that is not in compliance with all ORPS rules, regulations, and policies, the Owner requesting the permit must agree to bring the lot into compliance as part of the modification. g. A final inspection is required by the A&A Committee, or designee, at the completion of the approved lot modifications. Any deviation from the original approved specifications/plans will be removed at Owner’s expense h. Permits required by local authorities are the responsibility of the owner. i. Improvements done on a lot without a permit are subject to additional permit fees. 10. City Permits a. Improvements or Lot Modifications that entail work subject to City of Cathedral City permitting requirements, including but not limited to electrical work, plumbing work, or in connection with a retaining wall, will require applicable permit(s) from the City of Cathedral City. b. If so, the Owner is responsible to apply for a City of Cathedral Permit which should occur following submittal of a Lot Improvement Permit Application and preliminary approval of design by the A&A Committee (as required by the City of Cathedral City).

Made with FlippingBook Learn more on our blog