Westcourt Orlando Booklet

Design Assist Input

Experience

3.3

Design Assist

“A Process of Collaboration”

Preconstrucon Approach and Resources

Preconstrucon begins with knocking down barriers and working as a team to assist in designing the best product available while at the same me lowering costs.

Tri-City will employ proven preconstrucon teams to achieve opmal results. To achieve these results, we must be acvely engaged in the project during both the preconstrucon and construcon phases.

◊ The Pre-Construcon Lead provides up to date real informaon on how key decisions and inputs affect budgets. Our goal with design assist projects is to help the design team understand these impacts and how, collecvely as a team, we can ensure we are pung the best product out there at the best possible price. ◊ The BIM Lead and this teamwork alongside the design team, pre-construcon, and field teams work together to idenfy problemac areas and provide soluons. We pride ourselves on working through complicated issues using 3D modeling to confirm soluons work and keep the project on schedule. This coordinaon also provides detailed drawings for the field team and pre- fabricaon team to be able to build fast and accurately. ◊ The Field team assists our esmang team and the design team to apply learned field knowledge to design schemacs and ideas. This team also takes a hands-on approach when working with the Architects and Engineers. Together we can take a deep dive on key issues and resolve items that may hinder the project later on. ◊ The Operaonal Lead provides leadership and guidance ulizing the knowledge gained over many years of experience.

9

Tri-City Electrical Contractors, Inc. | “To Do More Than Expected” | www.tcelectric.com

Made with FlippingBook. PDF to flipbook with ease