Westcourt Orlando Booklet

Prequalification

Turner

Prequal

3.1 Turner Prequalification

◊ As required for proposal submission, Tri-City Electrical Contractors, Inc has successfully uploaded and submied the Turner Prequalificaon documents via the Verkal Portal. ◊ Any other confidenal financial informaon that is not already included in the Turner Prequalificaon list can be requested and provided by our CFO, Michael Germana, if needed.

2

430 West Drive | Altamonte Springs, FL , 32714 | 407-788-3500

Made with FlippingBook. PDF to flipbook with ease