Prequalification
Turner
Prequal
3.1 Turner Prequalification
◊ As required for proposal submission, Tri-City Electrical Contractors, Inc has successfully uploaded and submi ed the Turner Prequalifica on documents via the Ver kal Portal. ◊ Any other confiden al financial informa on that is not already included in the Turner Prequalifica on list can be requested and provided by our CFO, Michael Germana, if needed.
2
430 West Drive | Altamonte Springs, FL , 32714 | 407-788-3500
Made with FlippingBook. PDF to flipbook with ease