Building Reopening Checklist – Non-Potable Water Systems
Buildings or floors that have been lightly occupied (<10% of normal occupancy) or unoccupied for more than 21 days should prepare the non-potable water systems for reopening 1 to 5 days prior to re-occupancy as well as develop a plan for operations during periods of lower overall usage.
The CDC website for guidance for various building types is given here:
https://www.cdc.gov/coronavirus/2019-ncov/php/building-water-system.html
A checklist for reopening should include:
• Identifying team responsible for deciding when the building will be reopened
• Identifying the personnel responsible for reopening the building(s)
Note that for large campus system with multiple buildings it is unreasonable to open all buildings simultaneously so a priority list for opening buildings should be developed by the team
• Identify which non-potable systems are present and which ones will be operational or non-operational during the time period
Cooling tower •
•
Operational
Non-Operational
•
Swimming Pool •
•
Operational
Non-Operational
•
Hot Tubs •
•
Operational
Non-Operational
•
Decorative Fountains • Operational •
•
Non-Operational
Non-steam-based humidifiers • Operational • Non-Operational
•
• Drain and clean all Non-Operational Equipment