Building Reopening Checklist – Non-Potable Water Systems

Buildings or floors that have been lightly occupied (<10% of normal occupancy) or unoccupied for more than 21 days should prepare the non-potable water systems for reopening 1 to 5 days prior to re-occupancy as well as develop a plan for operations during periods of lower overall usage.

The CDC website for guidance for various building types is given here:

https://www.cdc.gov/coronavirus/2019-ncov/php/building-water-system.html

A checklist for reopening should include:

• Identifying team responsible for deciding when the building will be reopened

• Identifying the personnel responsible for reopening the building(s)

Note that for large campus system with multiple buildings it is unreasonable to open all buildings simultaneously so a priority list for opening buildings should be developed by the team

• Identify which non-potable systems are present and which ones will be operational or non-operational during the time period

Cooling tower •

Operational

Non-Operational

Swimming Pool •

Operational

Non-Operational

Hot Tubs •

Operational

Non-Operational

Decorative Fountains • Operational •

Non-Operational

Non-steam-based humidifiers • Operational • Non-Operational

• Drain and clean all Non-Operational Equipment