THE WAY A SHED SHOULD BE Since 1975, Heartland simply offers more. Most sheds include these features. See product pages for details.
STEEP 6/12 ROOF PITCH
BOXED OVERHANGS
VENTILATION Vent type varies
TRANSOM WINDOWS
OPERABLE WINDOW
EXTRA-WIDE DOUBLE DOORS
TREATED ENGINEERED WOOD SIDING
ALUMINUM THRESHOLD
Biltmore 12x8 Shown
`
DO-IT-YOURSELF
PROFESSIONALLY INSTALLED PROFESSIONALLY INSTALLED DELIVERED & INSTALLED FLOOR SYSTEM INCLUDED SHINGLES INCLUDED ADD PAINT **
PRE-CUT KIT, PRE-ASSEMBLED DOORS
ADD SHINGLES**
ADD PAINT**
Special Order Installed shed kits - delivered and assembled –just add paint
In Stock Take home today • Stock varies by store: Stillwater, Coronado, • Sold with premium treated floor or without a floor
Special Order Delivered to store
• Over 100 styles and sizes to choose from on Lowes.com/ Delivered to Store • All special order models sold with complete floor system
What Happens Next? • Heartland contact you to schedule your installation date • Build date is typically within 4-6 weeks • Date varies if permit or HOA approvals are required • Installation typically takes 1-2 days • All installation is done on site in your backyard • We build everything on-site, no preassembly • 3-ft clearance required to get materials to site • 3-4-ft. free and clear space required around and above shed • Access to electricity within 150-ft of site
• Site needs to be level within 6-in • Shed is built on 4x4 runners • Floor is 8-in off the ground, ramp may be needed • Order leveling package for concrete leveling blocks to be included • Check with your Home Owners Association for approval • If a permit is required, additional charges will apply • Want it installed on concrete slab instead of a wood floor? - No additional charge, different materials are used – no credit for floor - Ask for specifications before pouring the slab • Shed comes primed but not painted, additional charges apply
Midtown, and Scottsdale
Do-it-Yourself to Match your Home Customize it: Purchase paint, shingles, felt, drip edge and caulk not included in DIY KIT
**Sold separately.
**Sold separately.
WANT TO SEE MORE? Use camera to scan code
SCHEDULE CONSULTATION Use camera to scan code
Florida State License #CRC1329856
Call and Order 888.645.6937
DO-IT-YOURSELF: Obtaining a permit is the responsibility (and cost) of the homeowner. INSTALLED: When installed by Heartland and a permit is required, Heartland Industries (licensed Florida contractor) will take the necessary steps to obtain that permit for $399.00 (Item #716646) plus the cost of the permit. The cost of the permit is the homeowner’s responsibility. In order to obtain a permit, you will need to supply certain information.
You may need to provide one or more of the following documents. Permit processing may take 2-3 weeks. Auger Anchors are also required. Plot Plan/Site Survey: Customer responsibility Signed Notice of Commencement: Customer responsibility Engineered Plans: Heartland will provide Septic Survey (where applicable): Customer responsibility Signed Permit Application: Customer responsibility
HOA and/or Historical Districts: Customer responsibility Flood Zone: Construction in a flood zone is an additional cost and requires elevation certificates and special materials. In some cases, it may not be possible. Failure to inform Heartland can delay the completion of your building and add substantially to the cost, in addition to the flood zone upgrade required. Talk to your local Heartland for further assistance.
Buy On Line Today See an Associate
2
Made with FlippingBook Learn more on our blog