5 Unpacking and Installing the System
This section provides information on installing the KMR system:
• Planning the placement of the equipment
Components including with the system
•
Unpacking the system
•
Removing the red shipping tabs
•
Installing and setting up the system
•
• Obtaining on-site functional testing, calibration, and training
5.1 Planning the Placement of Equipment
When planning the placement of the KMR system, refer to the following recommendations:
• Ensure a clean operating environment to minimize the accumulation of dirt on the optics and on precision mechanical parts, such as lead screws and encoder scales. • Ensure the planned installation location has the proper electrical requirements. Refer to “Electrical Specifications” earlier in this document for detailed information. • Select an installation location where the temperature can be controlled to within 20°C ± 0.5°C (68°F ± 5°F), which is the calibration temperature of the system. • It is recommended (but not essential) the system be placed on a level work surface using a bubble level for verification. • Allow 60 centimeters (24 inches) to right or left side of the metrology unit to position the monitor. • Allow additional clearance of 30 centimeters (12 inches) on both sides is recommended for general access. Refer to “System Specifications” earlier in this document for the detailed information on the dimensions of the system.
5.2 Components Included with the System
The following information provides the components that are included with the system:
Component
Description/Quantity
KMR metrology system
1
14-inch monitor
1
MetLogix Mx200 unit
1
Power cables
• DB9 cable from System Controller to KMR unit (1 qty) • Power cable from System Controller to AC power source (1 qty) • 12V power supply for Mx200 readout (1 qty)
Additional cables
HDMI (1 qty)
•
X and Y encoder cables (2 qty)
•
Made with FlippingBook - professional solution for displaying marketing and sales documents online