7

GENERAL GUIDELINES AND ASSEMBLY RESOURCES • The Cooling Pool, Comms Towers, Pumps, and Fuel will have more detailed assembly instructions that come with the Mission 2026-2027 ADC Pro Teamwork Game Element Kit. • We recognize that variations in PVC lengths may result in minor variations. Per rule <T8>, the Field Perimeter measurements may vary by +/- 3

Additional Field Assembly Instructions

TEAMWORK FIELD PERIMETER ASSEMBLY

The Teamwork Field consists of two 10’ x 20’ netted PVC fields placed adjacent to each other with approximately a 3 inch gap between the two fields. When the Cooling Pools are attached to the Field Perimeter, there must be a 1 inch gap between the edges of the two Cooling Pools so they do not touch. The Comms Towers will connect using a T-connector at the midway point and rotated so that the Comms tower legs are adjacent to the Field Perimeter. The Comms Tower Drop Zones should be on opposite sides of each other as shown in Figure 7.1.

Figure 7.1 Top-down view of Field Perimeter and Comms Tower locations

MISSION 2026-2027 OFF GRID COMPETITION MANUAL V 1.1 | 85

Made with FlippingBook HTML5