ADC Pro 2026-2027 Off Grid Manual

AERIAL DRONE COMPETITION PRO • RECF

Skills Field Layout & Measurements

8

General Guidelines and Assembly Resources • The Keyhole Assembly, Barriers, and Arch Gate, will have more detailed assembly instructions that come with the Mission 2026-2027 ADC Pro Skills Game Element Kit. • Additional helpful assembly tips will be located in the ADC Pro Library. • The Coding Mats include gridlines that are helpful to align Field and Scoring Elements. Unless otherwise noted, align items with the gridlines on the Coding Mat .

Figure 8.1: Location of Coding Mats, Arch Gate, Fly Through Panels, Multi-Color Pads and the Keyhole Assembly

Coding Mats There are four Coding Mats used in a Skills Mission Field. The Coding Mats are placed adjacent to each other on their long-side. The Coding Mats need to be attached together using Gaffer’s tape (or other tape) on the back side to ensure they do not move during a match. Before an event, unroll the Coding Mats and use weights on the end so that the mats lay flat during the competition. If needed additional tape can be used to secure the edges of the mat to the venue floor if the corners are curling.

MISSION 2026-2027 OFF GRID COMPETITION MANUAL V 1.1 | 89

Made with FlippingBook HTML5