BSIC FUN FACTS
93 PILES
TOTAL FABRICATION TIME WAS 31 DAYS
IN THE FOUNDATION OF THE BUILDING
SOLAR PANELS 129
SECURITY CAMERAS ALONG THE BSIC 3.5 MILE ROUTE 300
ON THE ROOF
PRE-CAST PANELS 285
AIC’S BATTERY ELECTRIC STORAGE SOLUTION (BESS)
THE MICROGRID OFFSETS
THE ELECTRICAL POWER DEMAND FOR THE BUILDING 100% OF
CAN STORE ENOUGH ENERGY TO RUN A TYPICAL HOME FOR 2 WEEKS
9
Made with FlippingBook Digital Proposal Creator