GWO Basic Safety Training V14.0
2021-04-01_TS_BST_V14
Note: The class will be divided into three groups of four participants, maximum. The participants should use 10 minutes to discuss and generate ideas about rescue and emergency situations in the wind turbine environment. Each group should write the ideas on a flipchart that the instructor can display to enhance a large group discussion with the entire class during the remaining 10 minutes of the workshop.
PPE REVIEW
10 min.
The aim of this lesson is to give the participants the opportunity to discuss the individual parts of the PPE equipment and use of the PPE in their own words.
This lesson is intended to be a recap at the beginning of day 2.
To successfully complete this BST Module, participants shall be able to:
Recall the individual parts of the PPE equipment and correct pre-use inspection and use of the PPE
ELEMENT 16.1 - THE INDIVIDUAL PARTS OF THE PPE EQUIPMENT
Participants shall:
Recall the individual parts of the PPE equipment and instruction in pre-use inspection and use
RESCUE DEVICES AND RIGGING SETUP
20 min.
The aim of this lesson is to enable the participants to utilise a rescue device in a wind turbine environment.
To successfully complete this BST Module, participants shall be able to:
Explain the individual parts of the rescue equipment (L2 – Knowledge)
Explain correct usage of rescue devices, anchor points and slings, including various rigging configurations on a ladder system (L2 – Knowledge)
ELEMENT 17.1 - THE INDIVIDUAL PARTS OF DIFFERENT RESCUE DEVICES
The instructor shall:
Explain and demonstrate the individual parts of different rescue devices, including accessories, covering:
a. How to attach the device to an anchor point
b. How to utilise the integrated friction device (e.g. pig tail/bull horn) to divert the rope
Global Wind Organisation www.globalwindsafety.org
141 / 206
Made with FlippingBook - Online magazine maker