GWO BST V14.0

GWO Basic Safety Training V14.0

2021-04-01_TS_BST_V14

c. Breaking up loads & team lifting

d. Protecting pre-existing injuries

e. Adequate lighting

f.

Good housekeeping

MEASURES TO PREVENT INJURY DURING TRAINING

20 min.

The aim of this lesson is to reduce the risk of injury during training by ensuring that the participants are briefed in the control measures employed in the practical training area, and to warm up prior to performing rescue exercises.

ELEMENT 5.1 - CONTROL MEASURES AND WARM-UP

The instructor shall:

Explain further control measures for the specific training facilities and training to avoid injury during the training. Verify that the participants can explain the principles of operation of the PPE and equipment to be used during practical training sessions. Ensure that any hazardous energy sources which may affect the participants during the practical training sessions are isolated and locked out and that the status of the isolations has been communicated to the participants.

Lead a warm-up session of the major muscle groups of the body and the ankles, wrists and back.

Participants shall:

Take part in the warm-up session of the major muscle groups, ankles, wrists and back.

MANUAL HANDLING: RISK CONTROLS & PROPER MANUAL HANDLING

TECHNIQUES

110 min.

The aim of the lesson is to practice safe lifting techniques in a variety of scenarios in wind turbine work environments. To the greatest possible extent, the scenarios should include the challenges that were mentioned by participants during Lesson 3. The key learning from the BST Manual Handling Module lessons shall be practised during scenario-based training.

Global Wind Organisation www.globalwindsafety.org