PQF 2025 (Digital Copy)

Our Planned Preventive Maintenance (PPM) scope of activities:

Emergency Light / Exit Light

Checking of emergency and exit light physically for damage. Checking of emergency and exit light tubes visually for darkened side.

Checking of emergency and exit light by switching off the normal power supply/ panels and power from battery back up functionality test.

Special Systems

Verify the system nozzles fire hoses are in place and not obstructed. Inspect the system for any physical damages.

Testing the system operation by actuating false alarm for the fire extinguishing panel in order to check the two stage alarm functionality without discharging the gas.

Check the cylinders gauges/Foam tank are showing normal pressure and adequate gas/Foam quantity.

Fire Fighting Systems

Checks for leaks for any gaskets and seals

Check the lubrication of the pump

Inspect the interior and exterior damages of the vessel

Check operation behavior

Check for vibration noise bearing temperatures Check control panels for all electrical circuit

Check the pressure switches

Check the water flow and nozzles

Functional checks of the valves

Check all types of fire extinguishers on half-yearly basis.

Check pressure vessel and top up air if necessary

Prequalification File | 27

www.sergas.com

Made with FlippingBook - professional solution for displaying marketing and sales documents online