CH Aspire Inclusions-ChristmasUpgrade-Promo

CHRISTMAS UPGRADES

Other Home Inclusions

ASPIRE

Tender Period

12 months tender period from date of deposit

Construction Insurance

Construction insurance premium (home owners warranty)

Lifestyle Studio

Three dedicated days to carefully select the colours and finishes for your dream home, ensuring every decision is made with confidence and ease

Maintenance Period

90 day maintenance period

Pest Control

Pest control certification

Light points including compact fluorescent globe 30 x downlights

Lighting

Smoke Detectors Hot Water System Electrical Safety

Smoke detectors provided (direct wired with battery backup)

Electric hot water system

Earth leakage electrical safety switch in single phase meter box

Electrical

2 x TV and 2 x Cat 6 Data points

3.5kW of Jinko roof top solar panels and 3kW SolaX inverter 5.8kW SolaX battery, hybrid inverter upgrade and battery enclosure

Solar System

BASIX assessment to State Government requirements 7 Star BASIX requirements

BASIX Assessment

Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions

10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan

Mandatory Site Works

Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council

ASPIRE HOME INCLUSIONS | 4

Made with FlippingBook Publishing Software