CHRISTMAS UPGRADES
Other Home Inclusions
ASPIRE
Tender Period
12 months tender period from date of deposit
Construction Insurance
Construction insurance premium (home owners warranty)
Lifestyle Studio
Three dedicated days to carefully select the colours and finishes for your dream home, ensuring every decision is made with confidence and ease
Maintenance Period
90 day maintenance period
Pest Control
Pest control certification
Light points including compact fluorescent globe 30 x downlights
Lighting
Smoke Detectors Hot Water System Electrical Safety
Smoke detectors provided (direct wired with battery backup)
Electric hot water system
Earth leakage electrical safety switch in single phase meter box
Electrical
2 x TV and 2 x Cat 6 Data points
3.5kW of Jinko roof top solar panels and 3kW SolaX inverter 5.8kW SolaX battery, hybrid inverter upgrade and battery enclosure
Solar System
BASIX assessment to State Government requirements 7 Star BASIX requirements
BASIX Assessment
Basic scaffolding, void scaffolding and first floor protection, railing and roof scaffolding as per WH&S requirements, subject to site conditions
10.7 certificate Waste Management Plan Erosion and Sediment Control plan Neighbour Notification plan
Mandatory Site Works
Structural engineering certificate for concrete slab Site contour survey and plan and identification survey Soil test by engineer All weather access control point (standard allowance) Sediment control fencing as required by council Long service levy Trade waste compound as required by council
ASPIRE HOME INCLUSIONS | 4
Made with FlippingBook Publishing Software