Operations training
Crane and Hoist / V1 2023-07-03
d.
HOPS – Hoist Overload Protection Systems
e.
OPS – Overload Protection Systems
f.
RCI – Rated Capacity Indicator
g.
RCL – Rated Capacity Limiter
h.
Load Holding Valve
i.
Emergency Systems:
j.
Emergency Stop
k.
Emergency Load Lowering
The instructor shall:
Assign scenario-based group tasks related to safety and emergency systems
Provide feedback on the participants’ solutions
The participants shall:
Option 1. In small groups discuss safety and emergency systems and find solutions to solve the assigned tasks in the relevant manuals
Option 2: In pairs define the functionalities of the different safety system
Note
The above described exercise may be conducted on real lifting equipment during the practical exercises.
Interchangeable lifting equipment, for example a hook, hoist or a manual extension provided with a crane, is lifting equipment, and are not regarded as lifting accessories.
Note
LIFTING ACCESSORIES
60 min.
The aim of this lesson is to enable the participants to identify and apply different lifting accessories and configurations to basic lifting tasks and verify periodic certification of accessories
Global Wind Organisation ©2023 / www.globalwindsafety.org
29 / 107
Made with FlippingBook interactive PDF creator