2025-05-02_CraneandHoist_V2

Operations training

Crane and Hoist / V2 02052025

6. Mechanical systems

TOTAL

60 min.

7. Hydraulic systems

TOTAL

20 min.

8. Electrical systems

TOTAL

20 min.

9. Practical exercise

9.1

Training scenario 1

Training scenario 2, inspection and maintenance on cranes Training scenario 3, inspection and maintenance on hoists TOTAL

9.2

9.3

270 min.

10. Troubleshooting and fault finding according to manufacturers’ manual

TOTAL

90 min.

11. Training review

11.1 Training review 11.2 Feedback session TOTAL

35 min.

GRAND TOTAL

750 min.

Table 8.8.1 - GWO CHIM Module timetable

8.9 Detailed Description of the Crane and Hoist Inspection and Maintenance Module INTRODUCTION TO THE TRAINING

30 min.

The aim of this lesson is for the participants to be motivated and to engage in the training safely at a training facility, while recognising what is expected of them during the training.

After having successfully completed this lesson, the participants can:

3) Recognise what is expected of them throughout the module (Knowledge, basic level)

4) Take responsibility for their own safe engagement and learning during the training (Ability, intermediate level)

5) Name and point out local emergency procedures and facilities (Knowledge, basic level)

Global Wind Organisation ©2025 / www.globalwindsafety.org

48 / 111

Made with FlippingBook interactive PDF creator