2025-05-02_CraneandHoist_V2

Operations training

Crane and Hoist / V2 02052025

23) The participants can describe the main tasks related to inspection and maintenance of cranes according to relevant manuals (Knowledge, basic level)

Main tasks to be performed when inspecting and maintaining cranes:

a.

cleaning

b.

visual inspection

c.

lubrication

d.

preventive maintenance

e.

function test

f.

load test

A load test may on some systems be part of an inspection. Yearly inspection and maintenance require a load test, either done by physical weight or a dynamometer

Note

For training purposes and to minimise wear on the lifting equipment, a load test may be conducted by lifting a load of between 150 kg and 250 kg

Note

The instructor shall:

Involve participants experiences on main tasks for maintaining mechanical equipment through discussions and Q&As to ensure alignment between the participants understanding and the safety awareness on main tasks for inspecting and maintaining cranes

The participants shall:

Take active part in the discussions and share their experiences and understandings on maintenance main tasks for maintaining mechanical equipment

Main tasks for inspecting and maintaining fixed, small cranes must be presented in accordance with relevant local legislation, manufacturers manuals, and company requirements

Note

Hand-outs and check-sheets for training purposes may be used

Note

See Annex 3 for examples of an inspection and maintenance list

Note

Global Wind Organisation ©2025 / www.globalwindsafety.org

58 / 111

Made with FlippingBook interactive PDF creator