CraneHoist 20230703v1

Operations training

Crane and Hoist / V1 2023-07-03

Note

Components in training scenario 1 should be:

1. Single components from crane and hoist types and systems other than the functional ones available on the training site in whole

2.

Components from the cranes and hoists available on site, where dismantling and reassembling will be too time consuming or may pose a risk of unnecessary wear and tear on the equipment

ELEMENT 9.2 - TRAINING SCENARIO 2, INSPECTION AND MAINTENANCE ON CRANES

The participants shall:

Perform inspection and maintenance on a fixed, small crane following the maintenance procedure as described in the manufacturer’s manual and other relevant documents, e.g. the Inspection and Maintenance Log (see Annex 3)

Examples of exercises that must be conducted:

Exercise task

What to do

Equipment for training task

Carry out 1 year inspection and maintenance on cranes

Use the manufacturer’s manual for the correct inspection and maintenance on cranes Use the manufacturer’s manual for the correct inspection and maintenance on cranes Use the manufacturer’s manual for the correct inspection and maintenance of the crane

Carry out extended inspection and maintenance on cranes, for example 5 years inspection Carry out all the necessary load tests on cranes

Shackles, torque wrench, chain hoist, load cell, slings All lifting equipment must be within certification date (correct colour code) A multi choice assignment, where some questions may have more than one possible correct answers

The test is planned to be an individual test

Theory test on topics from the module (primarily learning objectives aiming at knowledge) that are not covered in the practical assignments in lesson 9

The participants must be informed if this is a formative or a summative test

Global Wind Organisation ©2023 / www.globalwindsafety.org

64 / 107