Operations training
Crane and Hoist / V1 2023-07-03
ANNEX 1 - EQUIPMENT LIST The following pages contain the lists of equipment required for delivering the Crane & Hoist Standard. The equipment required for training must be available and must fulfil national legal requirements where applicable. The tools, materials and equipment are needed for the execution of the modules are listed in the following pages. 1. Documentation: a. Manuals for different crane and hoist types that will be covered in the training
b. Lift plan for loads being lifted during practical training (this should be based on the lift plan in Annex 7)
2.
Communication tools: a. Two-way radios
3.
Slings:
a.
Endless synthetic
b.
Web sling
c.
Chain
d.
Wire rope
4.
Spreader beam
5.
Hooks
6.
Shackles: a.
Bow type: both screw pin and bolt/nut type with appropriate securing pins and rings.
b. Dee type: both screw pin and bolt/nut type with appropriate securing pins and rings.
7.
Lifting accessories: a. Lifting bags
b.
Taglines
8.
Load attachments: a.
Eye bolts and nuts
b.
Swivel eyebolts
Global Wind Organisation ©2023 / www.globalwindsafety.org
69 / 107
Made with FlippingBook interactive PDF creator