Operations training
Crane and Hoist / V2 02052025
Rated Capacity Chart
The crane’s capacity at a certain distance. A rated capacity indicator is attached to the crane
Safe zone
A defined and marked area for people to be safe during lifting operations
Shall
Verbal form used to indicate requirements strictly to be followed in order to conform to this training standard and from which no deviation is permitted
Should
Verbal form used to indicate that among several possibilities one is recommended as particularly suitable, without mentioning or excluding others, or that a certain course of action is preferred but not necessarily required Also known simply as a banksman, this role involves a broader scope of responsibilities beyond signalling. A banksman not only signals to the crane operator but also oversees the entire lifting operation. They are responsible for the safe movement and positioning of loads, ensuring that the area is clear of personnel, and communicating with the crane operator and other team members to prevent accidents
Slinger Signaller
3. CHANGE LOG
This section is deliberately blank
Amendment date
Version
Approved by & date
02052025
2
GWO TC 10042025
Description of changes
Changes Throughout:
• Aligned standard with GWO Corporate Visual Identity guidelines
Corrected spelling mistakes
•
Section 2. Terms and definitions:
Definition for “slinger signaller” added
•
Module 1 – Basic user
7.3 Duration of the crane and hoist basic user module
Total duration 10 minutes added
•
Lesson 4 Safety:
Total duration 10 minutes added
•
• Two new learning objectives about preventing dropped objects with corresponding learning activities added